At 6am the roof was still wet with last nights rain so we would have to wait until it dried before finishing painting. We decided to load the truck and make preparations so we’d be ready to leave for the church at El Triunfo at 9am. The team will deliver food to the believers there.


After breakfast the sun poped out enough to dry the roof and the “Roof Crew” sprung into action.

It didn’t take the guys long to finish. Finally the mass of rust and metal now wore a new white shinny coat. Hopefully it will protect and suffice for a long time.

Let me introduce you to this wild and crazy roof cleaning/painting crew. Trent and Michael, top row, worked like mad men from the get go. (Bottom L to R) Team Leader, David painted and supervised the operation whole Zack brushed the ridge and Greg, all the way from CA, painted the opposite side. I must say that after Monday I had my doubts about finishing the roof but these guys, as well as the entire team never gave up. They gave 200 percent 24 – 7.

Ely lead us in a devotion. Ps 137:2, “Don’t stop doing what God has gifted you to do.” Afterwards we headed for El Triumfo.

Lord bless – Lewis

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>